HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Newbie seeking help! ! !

2016-11-30View Original

Thread Content

How should local ventilation be arranged in the grinding area and welding area of a machining factory, since these areas are not fixed locations but merely zones?
Reply #22016-11-30
I think it’s about removing the air and allowing natural wind to come in.
Reply #32016-12-01
For general ventilation in welding, the exhaust volume should be determined based on the amount of welding rod used; in the absence of such data, it can be calculated at 3500 m3/h per welding point. When two areas are combined, an increased exhaust volume can be considered. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.