Thread Content
I would like to ask the experts: if the equipment is too long, can the tube box of the heat exchanger be transported separately from the shell and the tube bundle? Arrived at the site; now install the pipe box. Especially for devices in the above category, is it necessary to re-establish water pressure so that they can be inspected by the boiler inspection agency? Those procedures still need to be followed.
As far as I know, it is possible to carry out on-site assembly, but it is necessary to inform the local special equipment safety supervision authority, and to allow inspection of the manufacturing process by a special equipment inspection agency designated by the local provincial special equipment safety supervision authority; pressure testing is definitely required. It is likely that a bunch of documents will also be required, such as the assembly plan, inspection and testing plans, WPS, PQR, and all details related to hydrotesting. If heat treatment is needed on site, things get even more complicated: lol
Complete all the processes at the manufacturing plant, and then just perform pressing on-site once more
On-site, pressure must be reapplied and maintained; otherwise, who can you turn to if quality issues arise during transportation?
It seems quite troublesome; it’s better to just find a larger vehicle.
It should be possible; pressure must be applied on-site