2016-12-05View Original

Thread Content

After the pouring of factory building walls, equipment foundations, pipe gallery foundations, etc., a curing period of 28–30 days is generally required; in summer, a curing period of 15–20 days is usually needed for the strength to reach the required standard. Are there any measures, especially in cold winter weather, to shorten the curing time of grout and thus reduce the construction period? (Note: Discussed on the premise of ensuring grouting quality)
Reply #22016-12-06
Water reducers can indeed reduce the setting time, such as retarders, early-strength agents, and accelerators

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.