What inspection tasks must the project owner complete before the pilot production of a chemical plant?

2016-12-07View Original

Thread Content

What inspection tasks must the project owner complete, or what **procedures** must be in place, before the chemical processing plant begins trial production?
Reply #22016-12-07
Safety, fire protection, environmental protection, occupational health, and so on
Reply #32016-12-08
HG 20231-2014 Specifications for Commissioning of Chemical Industry Construction Projects; HGT20237-2014 Requirements for Technical Documents Related to the Completion of Chemical Industry Engineering Projects. Check to see if any of these are available
Reply #42016-12-08
As mentioned above, it can be downloaded online
Reply #52016-12-13
Fire safety inspection. During trial production, safety, environmental protection, and occupational health must be ensured.
Reply #62016-12-13
Calibration of pressure vessels, pressure pipelines, special equipment, safety valves, pressure gauges, and alarm devices.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.