The unit area will launch the “Weekly Topic” activity starting this week; we hope to receive strong support from the Friends of Haichuan! Your support is the driving force that pushes us forward! ! We kindly ask everyone to participate actively in the discussions. Our moderators will assign different levels of scores or rewards based on the depth of the discussions, and they will also review the scores given by members! ! ! This week’s topic is: “In the ‘three inspections and four determinations’ procedure prior to project handover, do you believe it is your responsibility, as an operator and technical staff member for the owner, to actively cooperate with the construction party to ensure that all tasks are completed?” ”And briefly explain your reasons. Every Saturday, the “Star of Classic Replies” is selected from all replies on this topic, earning 3 Charm points as a reward. At the end of the month, participants take part in the monthly evaluation; the winners receive 5 Charm points. Those who are named “Star of Classic Replies” for three consecutive months receive 10 Charm points. The weekly topic is updated on Mondays. This post was last edited by lxzzl on 2009-3-9 11:35.]
The common practice is for the owner to organize the personnel and divide them into professional groups.
Good, we strongly support it; it is an example for us to follow
I think it’s necessary to cooperate; this is more or less what I do at the moment. This post was last edited by lxzzl on 2009-3-3 11:59.]
Everyone should talk about their work experiences, the various conflicts that arose at work and the solutions found to address them, as well as draw some lessons from these experiences. In my opinion, this work is a process, not an end result at all.
One should take the initiative to cooperate, as the work will still have to be done by oneself in the end. This way, it is possible to serve as a means of supervision and follow-up, while also allowing for the early detection of any unreasonable issues, enabling one to offer one’s own opinions.
The early involvement of technical personnel is mainly to identify design omissions (based on my personal experience, common oversights by the construction party include omissions such as valves, cross-connections, exhaust at high points, and drainage at low points); The operation and measurement indication points are too high to be operated or observed, especially the on-site indication elements of the instrument ; Ladders are lacking or there are few of them, making routine inspections inconvenient ; There are insufficient supports and hangers, resulting in pipe deflection exceeding the standard requirements or instability of the pipes ; Elements such as beams and columns in pipelines or structures that affect the operation passage), identifying potential issues with construction quality, and checking unfinished work. A thorough and meticulous inspection is carried out on the quality of installation for each design drawing, each process technology plan, each control scheme, as well as for every piece of equipment, pipeline, valve, instrument, etc., with records being kept in a categorized manner. For the identified problems, assign tasks, designate personnel, set deadlines, and determine measures. The early involvement of operators mainly involves becoming familiar with the processes and procedures, as well as assisting technical staff in inspections (such as checking whether bolts are properly installed, the installation sequence of directional valves and pipe fittings, whether all static electricity bonding connections are in place, whether blind plates need to be installed or removed, whether the installation of valves and platforms meets operational requirements, and whether anti-corrosion and insulation measures have been properly applied). This post was last edited by lxzzl on 2009-3-6 08:54.]
In my opinion, technicians should identify the defects present in the construction and design, especially those issues that are likely to arise once the installation is operating normally, and promptly suggest corrections to the construction party. Examples include the lack of drain valves on the level gauges, the inconvenient location of some manual valves making it hard to operate them, and the fact that safety valves lack upstream and downstream manual valves, which makes it difficult to remove them for regular calibration once the installation is in normal operation, among others. During the process of three inspections and four determinations, the operator helps to check whether gaskets are present and whether the bolts on the flange surfaces are loose. Additionally, based on the issues identified during these inspections, as well as the inconveniences that arise from daily tasks such as sampling, turning the shaft, and operating valves, the operator can work together with the technical staff to compile a list of problems and submit it to the construction party for correction. After all, at this stage the project has not yet been handed over, and they are still willing to carry out many of the tasks that have been requested. But once the project is handed over, asking them to make various corrections will be much harder – it will be difficult to get them to work on such things. Last year, in a hydrogen production plant I was working on, some details related to the pre-handover inspections and adjustments were not taken into account; I failed to ask the construction team to make the necessary corrections in time. After the handover, they started working on those tasks but kept delaying them, and as a result I suffered losses! This post was last edited by lxzzl on 2009-3-6 08:55.]