HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How should the classification of hot work be determined when performing hot work on different sections of the same pipeline across various areas?

2023-07-24View Original

Thread Content

For hot work 11, which involves performing hot work at different locations along the same pipeline that runs through various areas (with the pipeline having been isolated and purged), how should the classification of such hot work be determined?
Reply #22023-07-24
One point per vote; analyze each situation based on the actual conditions on site
Reply #32023-07-24
Classified into flammable and explosive categories and non-flammable and non-explosive categories
Reply #42023-07-24
Issue hot work permits by different area
Reply #52023-07-24
Handle in accordance with the fire protection requirements of the operation area

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.