Why is it necessary to emphasize that when performing hot work inside the fire dike of an oil and gas storage area, water removal (isolation) and sampling operations should not be carried out simultaneously?

2023-08-20View Original

Thread Content

Why is it necessary to emphasize that when performing hot work inside the fire dike of an oil and gas storage area, water removal (isolation) and sampling operations should not be carried out simultaneously?
Reply #22023-08-21
Wait for a collection of answers, Mark
Reply #32023-08-21
The dehydration sampling process also poses safety risks
Reply #42023-08-21
During water removal (cutting off water) and sampling operations, flammable liquids may spread to the area where welding is being performed

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.