Weekly Topic: What issues should be considered in the coal slurry preparation system of water-coal slurry gasification units during the engineering design phase?

2011-07-04View Original

Thread Content

This post was last edited by wlq1970 on 2011-7-4 08:38. What issues should be considered in the coal slurry preparation system of coal-water slurry gasification units during the engineering design phase?
Reply #22011-07-05
Although I don’t understand it, I can learn it* and get through it
Reply #32011-07-10
1. Consider the local ambient temperature – is it necessary to use a closed factory building?; 2. Consider maintenance – is a maintenance platform needed? ; 3. Consider the scenario where the mixer stops suddenly – how can it be ensured that the coal slurry does not settle in a short period of time? ; 4. Consider the impact of mill vibration on the frame ; 5. Where necessary, fire protection considerations can be incorporated in accordance with the coal chemical industry fire protection standards (to be issued), etc

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.