HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Support installation for inlet and outlet pipelines of reciprocating compressors

2017-05-16View Original

Thread Content

This post was last edited by sue211 on 2017-5-17 at 14:34. The regulations state that \"the foundations of the support structures for the inlet and outlet pipes of large and medium-sized compressors should be separate from the foundation of the factory building.\" ” If the foundations of the pipe supports at the compressor’s inlet and outlet are located below the foundation of the factory building, but are not connected to it. For example, the foundation of the compressor is at -2 meters, while the foundation of the pipe supports is at -1 meter. Is it feasible to do this?
Reply #22017-05-16
I’m not particularly familiar with this area; I’m not sure. I’ll wait for answers from other sea travelers
Reply #32021-04-25
I think it’s feasible; the separation specified in the guidelines is to avoid them being connected together, which would prevent the pipe rack from functioning properly.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.