HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Airtight pressure test of pipeline reinforcement plates

2017-07-26View Original

Thread Content

Currently, the project requires that the reinforcement plates on the pipes undergo a gas-tightness test. 1. I would like to ask how you handled such tests in the past? 2. What size are the holes usually made in the reinforcement plate? 3. The project specification requires 6mm holes – how can they be connected to the pressure testing air pipeline?
Reply #22017-07-26
Didn’t you leave a 1/4\" NPT threaded hole? Then it can be connected. You’ve drawn the diagram too, but you don’t know how to do it?
Reply #32017-08-07
This is the information I found. The question is: Have you never seen threaded fittings as small as 1/4”? It still has external threads; the hole is too small

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.