HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Design change

2018-04-03View Original

Thread Content

In the construction of pressure pipelines, what changes require a design modification?
Reply #22018-04-04
The method has changed, and the materials have changed. Generally, whenever there is something to do with calculating costs, changes are required.
Reply #32018-04-04
Whenever money is involved or there are safety hazards, a written document detailing the changes must be prepared

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.