HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is the construction of changing the starting point, ending point, and route of pressure pipelines considered renovation or installation?

2018-10-20View Original

Thread Content

This post was last edited by God’s Sonata on 2018-10-20 09:53. The client needs to update and reposition the container, which has resulted in changes to the starting points, ending points, and route of the pressure pipes connected to it; it is necessary to cut part of the existing pipes and connect them to the new container. In this case, should a notification for the modification of pressure pipelines or a notification for installation be issued before construction? The new container’s location is only 5 meters away from the original location.
Reply #22018-10-20
I hope someone can come in and help me
Reply #32018-10-20
In other words, the construction notice refers to the renovation
Reply #42018-10-21
For new pressure vessels, an installation notification must be submitted, while old pressure vessels that are no longer in use require procedures to be carried out to deactivate them. Notification for the modification of pressure pipelines.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.