HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

PVC pipe hydrostatic test

2018-11-19View Original

Thread Content

Are PVC pipes subjected to hydraulic pressure testing when they leave the factory? Looking at the following table in GB/T 4219.1., what should I do if I don’t understand it? Please give me some advice, thank you!
Reply #22018-11-20
This experiment refers to the test of the manufacturer's products. You can ask the manufacturer to do it, but it does not need to be done on every piece. It is usually done on a random basis.; Each piece requires a 1.5 times hydraulic pressure test before leaving the factory. The 1000h withstand voltage test is a verification of product performance testing
Reply #32020-04-07
Pipe inspection is divided into factory inspection and type inspection. Factory inspection is conducted at 20℃, 1h, and ring stress 40MPa. This is an item required for type inspection.
Reply #42020-04-08
Only the hoop stress is given, is the test pressure calculated based on the diameter and wall thickness? Thanks!
Reply #52020-05-14
Yes, formula: Test pressure p=pipe hoop stress (δ)X2X wall thickness (en)/

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.