HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Cleanliness control during steam pipeline cutting

2019-01-10View Original

Thread Content

Two large steam inlet valves need to be replaced in the turbine steam inlet pipeline, and the existing steam pipes must be cut. How can the cleanliness of the steam pipes be ensured during this process, and how can it be determined whether the pipe cleanliness meets the requirements?
Reply #22019-02-19
Were the valve connections and pipeline fittings all replaced as well? If cleanliness is a concern, is it the contamination of the sections that were not replaced, or rather the new pipelines after replacement? This needs to be clarified, as it is closely related to the operating conditions. After all, there are specific standards for steam turbine purging, and following those standards should prevent any problems

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.