Pressure pipeline modification

2020-07-21View Original

Thread Content

Our company currently has a section of steam pipeline of DN50 and 10kg (pressure pipeline has been reported). It needs to be rectified. Are there any procedures that need to be followed?
Reply #22020-07-23
TSG D0001 Pressure Piping Regulations:
Reply #32020-07-23
The design institute issues drawings and a qualified installation unit performs the installation. It needs to be notified before installation.
Reply #42020-07-24
Pipes with DN≥50 and working pressure ≥0.1MPa (10kg) are pressure pipelines. You can find the original design unit or a design unit with GC2 qualifications to design, and then find a unit with GC2 installation qualifications. It needs to be reported to the safety supervision bureau of the construction site. This is probably the case. It is recommended to consult the installation unit. They often do this and are more familiar with the process.
Reply #52020-07-26
What should be rectified? It’s not clear whether it was a transformation or not. This must be a pressure pipeline. It needs to be notified before construction. It is not a GC1 pipeline. What is the content of the pipeline modification? It would be much easier if there was no need for on-site supervision.
Reply #62020-07-26
First go to the archives room and find the original drawings.
Reply #72020-07-27
There were no compensators or U-shaped bends during the original installation. Now some of the pipes are deformed. We are going to replace them and add compensators.
Reply #82020-07-28
This post was last edited by yujwlhh on 2020-7-28 16:32 This should be a notification for the transformation of the pressure pipeline. If the number of added U-shaped bends is not large, as long as the notification is successful, the construction can be carried out according to the drawing. After the construction is completed, the construction unit will issue a quality certificate for pressure pipeline reconstruction. Subsequently, you can go to the supervision agency to go through the corresponding procedures with the quality certificate. Of course, construction materials are essential.
Reply #92020-07-29
Can we produce the drawings ourselves, or should we require the design institute to produce them?
Reply #102020-07-29
A unit with design qualifications will issue a design blueprint
Reply #112020-07-30
We now want to change this pipe to DN40 to avoid later risks. Is this feasible?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.