Thread Content
This post was last edited by Yunmu on 2019-4-29 21:08: [Process Engineering Section – Pipeline and Valve Technology Exchange Forum – Daily Question – Question 04-30]. The content of industrial construction involves installing prefabricated and tested pipeline assemblies to form a pipeline system. ( ) Judgment Remarks: Questions are valid only on the day they are posted (3 correct answers, 1 wrong answer; posts filled with irrelevant content will be deleted). Responding in large numbers to previous posts is considered spamming, and such responses will result in no points or points awarded at the discretion of the organizers. Regarding the upcoming update of the next topic, you can send the question bank related to chemical engineering software (along with answers) to my email address 12315827@qq.com. Once it is included, a reward of 10–100 wealth points will be given depending on the quality and quantity of the questions in the bank. If you have a large number of questions, you can contact me via the in-site messaging system; rewards will be provided collectively, and they are not limited to wealth points only. The question bank will serve as the source for the “One Question per Day” section in the chemical engineering software category. First come, first served – rewards will be granted based on the first email received. Please include the forum username and UID in the email subject.