Newbie asks: Does the instrument panel box have to be mounted on a pipe rack?

2019-05-05View Original

Thread Content

I looked at the drawings that were released a couple of days ago; after examining the floor plans for the pipe racks and instrument enclosures, I found that on the same floor of the same building, the floor plan for the pipe racks and the floor plan for the instrument enclosures cannot overlap. In some areas, there are instrument enclosures present, but no pipe racks are shown in the pipe rack diagram. 1. Logically, shouldn’t the tray be placed on the pipe rack? 2. Also, I heard the managers discussing that after the electrical junction boxes are in place, the instrument junction boxes should be hung below them? Is this okay too? Or did I misunderstand? ?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.