Pipeline drain length issue

2019-08-03View Original

Thread Content

As the title suggests, in the design, what should be the length of the drain or vent pipe for the pipeline? Are there any standard requirements? It is too long and prone to freezing in winter (when the medium is water or steam), which can damage pipes or valves. It is only known that the distance between the two circumferential welds must not be less than 50 mm (for sizes below DN150).
Reply #22019-08-03
What was seen on site was mostly around 10 cm
Reply #32019-08-04
Thank you for the reply. Are there any relevant standard requirements?
Reply #42019-08-04
I’m not sure about the standard either; in the plant where I used to work, everything I saw was basically this long

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.