HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Can pipe branches be placed on the ground to serve as supports for the main pipes?

2019-10-28View Original

Thread Content

When working on pipe design, has anyone encountered a situation where it’s possible to have the branch pipes rest directly on the ground, with those pipes used to support the main pipes? Is such a design in compliance with the regulations?
Reply #22019-10-28
I’m not sure if it complies with the standards, but I’ve indeed never seen piping arranged in this way. Pipe supports should come with brackets; in my opinion, this arrangement is not suitable, as the welds between the branch pipes and the main pipe will experience stress, which can lead to cracks and leaks
Reply #32019-10-29
This post was last edited by wx_Ma Yi 19574 on 2019-10-29 21:28. It does not meet the requirements! ! ! The section of the pipe in contact with the ground forms a blind spot, making it prone to corrosion and leakage
Reply #42019-10-29
Personally, I think this approach is not proper, but I’m stuck because I can’t find any guidelines on how to refute such a situation. I once saw a guideline stating that fittings should not touch the ground directly, but I was unable to locate the exact source of this rule. .
Reply #52019-10-30
It does not meet the specification requirements, especially regarding pressure pipelines
Reply #62019-10-31
It does not meet the specification requirements: (1) Branch pipes should generally emerge from above the main pipe; (2) It is not clear what equipment is located on the right side, and the stress on the pipe connections of that equipment does not meet the required standards. (3) The blind end of the branch pipe is too long, exceeding the requirements of the corrosion specifications. (4) If used in front of the pump, an adjustable-height bracket should be employed. There are a few more areas that do not meet the standards; the reference books on pipeline design outline the basic requirements, but it seems that the designer does not understand pipeline design

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.