2019-11-18View Original

Thread Content

Boundary problem for GD-type pipelines: Hello everyone. Steam generated as a by-product in a thermal power plant has a temperature of 210°C and a pressure of 1.6 MPa; it is extracted from the steam distribution cylinder in the power plant and sent to the chemical plants within the industrial complex for use. This pipeline runs from the steam distribution cylinder to the main pipeline corridor in the chemical plants – so does this pipeline fall under the GC category or the GD category? It travels about 500 meters inside the power plant, and another 1 km along the pipeline corridors in the industrial complex outside the plant.
Reply #22019-11-18
The issues with GC and GD are not new GCD issues.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.