HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Skid-mounted equipment

2020-03-17View Original

Thread Content

I provide technical services and support for skid-mounted equipment used in oil and gas pipelines; feel free to reach out if needed (products such as analysis instruments and analysis booths).
Reply #22024-05-19
In the production of petrochemical skids, when square steel is used to make the base skids, excessive longitudinal bending often occurs after welding; this issue is addressed by using local flame heating followed by rapid cooling for adjustment. Both the efficiency and effectiveness are not very satisfactory. Are there any clever tricks? Using square tubes filled with water before welding results in very little deformation, and the outcome is good as well. Is it allowed to do this? One unit was forgotten to have its water drained, which led to a funny situation during the inspection.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.