HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues regarding the calibration and labeling of safety valves

2020-06-22View Original

Thread Content

After the safety valve is calibrated, it should be labeled; can only the date of the next inspection be marked on the steel plate? Is it necessary to specify the exact date including year, month, and day?
Reply #22020-06-22
The calibration tags for the safety valves here only indicate the month and year, without specifying the day! Since the company’s safety valves are regularly calibrated, and there are quite a number of them, only a certain monthly limit is set rather than a daily one, which makes it more practical to implement! :victory:
Reply #32020-06-22
Safety valves are subject to mandatory inspection – isn’t it the special inspection agency that carries out the calibration and issues the certification?
Reply #42020-06-22
The calibration of safety valves should be carried out by qualified units. Besides indicating the year and month, there should be other content as well.
Reply #52020-06-23
There is also the verification report number and the pressure set for this adjustment.
Reply #62020-06-23
No, the time, date, setting pressure – all of these are necessary
Reply #72020-06-26
Those on the steam pipes and steam drums that are subject to mandatory inspection must have inspection tags attached during the inspection; the specific date should also match what is stated in the inspection report
Reply #82020-06-26
The calibration report for TSG ZF001-2006 requires the calibration date to be filled in.
Reply #92020-06-26
Our company conducts inspections on a monthly basis, but the date set for the next inspection is set as the day before the expiration date indicated on the inspection report, in order to comply with the regulations regarding inspection cycles outlined in TSG ZF001-2006.
Reply #102020-06-29
Our safety valves also only have the year and month; the inspection report specifies the exact date.
Reply #112020-06-29
The test report includes the detailed date in year, month, and day

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.