Regarding pressure testing of industrial pipelines

2020-11-19View Original

Thread Content

Hello, Sea Friends! One of the provisions in the pressure testing plan for process pipelines states that when the design pressure is greater than 0.6 Mpa and hydraulic testing proves difficult, hydraulic testing can be replaced by pneumatic testing with the approval of the design and construction parties. Is this sentence taken from that standard? Is the statement correct and reasonable? I need help, thank you!
Reply #22020-11-19
From Article 8.6.2 of the Code for Construction of Industrial Metal Piping Engineering (GB50235-2010). “2 When the design pressure of the pipeline is greater than 0.6 MPa, and the design and construction parties consider a hydraulic test to be impractical, a pneumatic test as specified in Article 8.6.5 of these specifications may be used in place of a hydraulic test. ”

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.