Thread Content
Explanation: The drainage pipe of the equipment is at a height of 40 above the platform (DN15), while the main drainage pipe is at a height of 232 above the platform (DN25). The DN15 pipe connects to another device; how should the piping be connected so that water can be drained and no water remains in the DN15 pipe? Please ask
A collection tank is added at the end of the device’s drainage pipe (DN15), and then the liquid is pumped into the pipeline (DN25).
A drainage tank is added at the end of the device’s drain pipe (DN15); a certain liquid level in this tank allows gas to be used to drive the water into the main pipe (DN25).
As mentioned above, it is necessary to add collection facilities as well as external conveying power
Hello, I’m from Foshan Henghexin Pipe Management Co., Ltd. Our company specializes in the production of various industrial stainless steel welded pipes and accessories. . If your company needs pipes and fittings for fluid transport projects, you can call or send a WeChat message to inquire about prices and quality; Manager Chen’s contact number is 18912850123
The pressure for DN15 should be higher than that of DN25; DN15 is connected to the DN25 pipeline from above, and a drain valve should be installed at the lowest point of DN15
Draw a diagram to see how to solve this problem
Yes, your method is good – simple and straightforward