HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Piping in the inner tank group of the storage tank does not pass through

2024-04-03View Original

Thread Content

The pipes for material inflow and outflow in the storage tank pass through other partitions at one end; does this count as passing through? How should it be rectified? Thank you!
Reply #22024-04-03
If the pipes for material inlet and outlet in the storage tank pass through other dikes from one end, this is considered as passing through. The methods for correction can include rearranging the pipes to avoid passing through the dike, or installing appropriate protective measures at the points where they do pass through, such as using seals or cofferdams. The best remediation plan needs to be determined based on the specific circumstances. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.