HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

When there are no buffer tanks on the station, an emergency shut-off valve that is easy to operate should be installed on the loading and unloading pipelines at a distance of more than 10 m from the loading/unloading crane positions

2021-02-22View Original

Thread Content

"When there are no buffer tanks on site, an emergency shut-off valve that is easy to operate should be installed on the loading and unloading pipelines at a distance of more than 10 meters from the loading/unloading crane positions. Since the crane positions are less than 10 meters away from the fire dike, where should this shut-off valve be installed? Thank you.
Reply #22024-09-06
In that case, the cut-off valve of the tank should be equipped with an emergency stop button

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.