Inspection methods for pressure pipelines

2021-07-10View Original

Thread Content

In chemical engineering projects, RT is the standard method required for inspecting pressure pipelines. For the project I am currently working on, the special inspection agency has approved the use of ultrasonic phased array technology as a substitute for RT by the construction party. However, since phased arrays are not covered in the standards for pressure pipeline inspection, I rejected the alternative proposal. No examples of phased array technology can be found online. Is there anyone who has experience with phased array detection methods? I would be grateful if you could share your insights Thank you.
Reply #22021-07-11
1. In chemical engineering projects, RT is the conventional requirement for the inspection of pressure pipelines. Which standard does this conclusion come from? Why not ask the Special Inspection Agency why it agreed to the substitution?
Reply #32021-07-20
The special inspection agency only gave vague suggestions to the construction contractor and the owner, without establishing clear communication with the design institute.
Reply #42021-07-21
You did right! I’ve encountered that too, but in the end the Special Inspection Agency agreed as well
Reply #52021-07-22
In certain situations at the pipeline installation site, RT testing cannot be carried out, and other testing methods must be considered instead. Phased array ultrasound and TOFD are non-destructive testing methods that have been widely used in recent years; they are more advanced and reliable than traditional ultrasound testing. Under conditions where certain pipe diameters and wall thicknesses are met, combining them with local RT testing also constitutes a viable non-destructive testing approach for use in specific field conditions.
Reply #62021-07-30
Thank you; Part 15 of NB/T 47013-2021, which will come into effect in August, clearly specifies the phased array testing method, providing a basis for this.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.