HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Help, please translate a sentence

2021-12-02View Original

Thread Content

Guys, let’s see how we can translate it more accurately. The machine train will be mounted on a concrete table; nevertheless, the individual components shall be pre-piped and pre-wired as much as is practically possible.
Reply #22021-12-02
The machine will be installed on a concrete base; in practice, these individual components should have pipes laid and wiring installed in advance
Reply #32021-12-02
The locomotive will be installed on a concrete platform; in practice (before installing the equipment or constructing the concrete platform), pipes and wiring should be laid in advance for these individual components. Before deciding whether to install equipment or build a concrete platform, pipes should be laid and wiring installed first. . . . . . It depends on the specific circumstances of the project
Reply #42021-12-04
Thank you, thread owner :handshake:handshake

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.