HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Jilin Chemical Fiber’s high-efficiency large-tow production line with an annual capacity of 4,000 tons was successfully commissioned on its first attempt

2026-03-10View Original

Thread Content

On March 6, Jilin Chemical Fiber Group Company’s high-efficiency large-tow production line with an annual capacity of 4,000 tons was successfully commissioned for the first time! Line 5 in the western area of Jilin Chemical Fiber Guoxing Carbon Fiber Company’s 60,000-ton carbon fiber production project was put into operation as scheduled. The project was launched in the second half of 2025, and it took nearly half a year to achieve commissioning after startup. Line 5 in the West Area of the 60,000-ton carbon fiber project is currently the world’s widest high-efficiency carbonization production line per line and per pass, with an annual designed capacity of over 4,000 tons. In the middle and late part of this month, 2 more carbonization lines will be put into operation one after another. By 2025, the group company is expected to achieve sales of 56,000 tons of carbon fiber, ranking first in the world.
Reply #22026-03-10
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Eyewash Station Water Outlet Height Less Than 15 cm https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715076 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-03-10
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Eyewash Station Water Outlet Height Less Than 15 cm https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715076 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42026-03-11
【Ten Years of Rapid Development in Chemical Equipment】The first fully electrically driven pyrolysis gas compressor in China was successfully tested in the Tarim Phase II ethylene project at Dushanzi Petrochemical https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714974 (Source: Haichuan Chemical Forum (HCBBS))
Reply #52026-03-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】3033-2026: China’s first 10,000-ton-per-year demonstration production line for the fiberization of coal-based solid waste goes into trial operation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715051 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-03-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】3033-2026: China’s first 10,000-ton-per-year demonstration production line for the fiberization of coal-based solid waste goes into trial operation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715051 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72026-03-13
【Ten Years of Rapid Development in Chemical Equipment】3034–2026: The world’s first fixed-bed copper-based catalyst process; East China University of Science and Technology, in collaboration with chlor-alkali chemical manufacturers, overcomes the challenge of recycling hydrogen chloride as a by-product. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715177 (Source: Haichuan Chemical Forum (HCBBS))
Reply #82026-03-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2037 to 2026: China’s first independently designed and built large-scale integrated fracturing engineering vessel, the “Ocean Oil 696”, was delivered in Zhoushan, Zhejiang. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715229 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-03-17
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #102026-03-18
【Ten Years of Rapid Development in Chemical Equipment】3038=2026: Shandong Energy’s independently developed aldehyde-based fragrance project fills a technical gap in China, reducing reliance on imports! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715785 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #112026-03-19
【Ten Years of Rapid Development in Chemical Equipment】China’s first 20,000-ton wet-process masterbatch production line was put into operation at Hei Mao in Jiangxi from 2039 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715864 (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.