Regarding the classification of underground pipes in petrochemical plants, what are the principles regarding the construction sequence of underground pipes, pile foundations, and foundations? Generally, people use z...

2017-11-06View Original

Thread Content

This post was last edited by 328104062 on 2017-11-6 at 10:19. What are the principles regarding the classification of underground pipes in petrochemical plants, as well as the sequence of construction for underground pipes, piles, and foundations? 1. What are the differences between first-level ground management, second-level ground management, and third-level ground management? Regarding the selection of anti-corrosion grades for underground pipes, which ones use ordinary or premium grades (glass cloth + coal tar pitch)? In what situations is 3PE used? 2. What is the construction sequence for ground pipes and pile foundations? Should we drive the piles first, then install the underground pipes? Should the underground pipes be laid first and then pilings driven? In my opinion, it’s the former. 3. What is the sequence of construction for the underground pipes and the foundation? Should the foundation be laid first and then the underground pipes installed, or should the underground pipes be installed first and then the foundation constructed? When I worked on projects in the past, I would first lay a solid foundation (no pile driving if the geological conditions were good; the foundation was built to a depth of 3 meters), and then backfill the soil up to 2 meters above the level of the underground pipes. What is the principle behind this sequence? Which one has a greater burial depth? Should we work on that one first?:? 4. If the foundation conflicts with underground pipes, who usually gives in? Will the underground pipes be rerouted?
Reply #22017-11-06
1. The classification is not very clear, but one thing is certain: the diameter of the pipe, the properties of the medium, and their importance within the device. For the anti-corrosion options of the premium and 3PE categories, they definitely belong to Class 1 pipelines. 2.3. Combining: Foundation piles first, then pipes. If the burial depth of the pipes is greater than that of the foundation piles and they are adjacent to each other, then the element with the greater depth should be installed first. 4. Pipeline rerouting, unless the overall cost of pile foundations is lower than that of pipeline rerouting, in which case it is a different matter. The above are purely my personal opinions; those who disagree need not criticize. Technical experts are welcome to answer any questions.
Reply #32017-11-06
Should we look for the relevant specifications?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.