[Civil Engineering Version] Daily Question 20180203

2018-02-03View Original

Thread Content

The basement should be designed with a waterproofing system that covers its entire perimeter; however, if the design maximum groundwater level is below the basement floor, and there is no possibility of water accumulation in the soil and fill material within the site area, a moisture-proofing solution may be sufficient.   A、0.10~0.30m   B、0.30~0.50m   C、0.50~0.70m   D、0.50~0.90m Correct answer: B
Reply #22018-02-03
B, 0.30~0.50m
Reply #32018-02-03
 B, 0.30~0.50m
Reply #42018-02-03
The basement should be fitted with a waterproofing system that covers its entire perimeter; however, if the design maximum groundwater level is below the basement floor (B), and there is no possibility of water accumulation in the soil and fill material within the foundation area, a moisture-proofing solution may be used instead.   B, 0.30~0.50m
Reply #52018-02-03
B, 0.30~0.50m
Reply #62018-02-03
B, 0.30~0.50m

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.