How are generators used at petrochemical sites grounded?

2018-07-12View Original

Thread Content

There are 200KW gas generator sets on site currently, and the output wires consist only of the three phases A, B, C and the neutral wire N. Is this because it was not specified during procurement that the PE wire should also be led out from the generator’s neutral point, or is it simply not possible to lead out a PE wire from the generator’s neutral point?
Reply #22018-07-13
The generator serves as the power source, and it does not have a PE wire of its own; the output wires are ABCN
Reply #32018-07-13
I’m using this post to ask a question: Is it necessary to provide a separate ground connection for the welding machine’s enclosure?
Reply #42018-07-13
It is necessary; the site must be properly grounded
Reply #52018-07-16
There’s also this operation: funk:
Reply #62018-07-16
As a supplementary note, TN-S is considered the safest option; this means that a 5-core cable is used to connect the generator to the electrical equipment. But how is it connected at the generator end? Where should the neutral point be connected?
Reply #72018-07-16
The generator does not have a five-core outlet; it only has three phases, as well as the live wire and the neutral wire. The PE wire can be connected to the distribution panel.
Reply #82018-07-16
If the PE is led out from here at the distribution panel, then wouldn’t it become TN-C-S? :handshake
Reply #92018-07-16
The generator can be regarded as a power source; it can be thought of that way as well

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.