The preparatory work before column installation includes the following () tasks. A: Project the axis of the column column onto the top surface of the column base. B: Mark lines on the column shaft. C: Level the bottom of the cup. D: The actual elevation of the top surface of the bracket and the top surface of the column should be consistent with the design elevation. E: The allowable vertical deviation for the column shaft is ±5 mm when the column height is ≤5 m. Answer: ABC
Reply #22018-11-06
B:Marking the column shaft C:Leveling the bottom of the cup
Reply #32018-11-06
A: Project the column axis on the top surface of the column base; B: Mark lines on the column shaft; C: Level the bottom of the cup

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.