HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

LNG terminal construction process

2017-09-07View Original

Thread Content

Hello everyone, I have a question. Recently, due to the company’s transition from coal to gas, and since pipeline gas cannot be delivered, we need to use LNG for supply. I would like to know what the process is for building an LNG receiving facility. Is it necessary to have a design institute carry out the design work? Are there any specific standards that need to be followed regarding site selection? Is it easy to obtain approval for pressure vessels? By the way, what are some good brands of gasification equipment available in China? If possible, would any experts be willing to share some construction plans? :handshake
Reply #22017-10-03
There are two types: regular and ranked. With all the proper procedures in place, and if there is space available at the factory, it should be approved. Designed by the design institute, notification of project commencement, supervision and inspection, etc.; once completed, a report is issued to obtain the container usage permit.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.