HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is it appropriate to locate the LNG loading pump within the tank farm dike?

2019-01-11View Original

Thread Content

Is it acceptable to locate the LNG loading pump within the tank farm dike (with a base that is above the top edge of the dike)?
Reply #22019-01-11
Those that do not meet the requirements should be located outside the tank farm dike; remember whether it is 20 meters or 30 meters outside the tank farm dike.
Reply #32019-01-12
Is it 20 meters or 30 meters outside the tank farm cofferdam? In that case, the required net positive suction head at the pump inlet becomes higher
Reply #42019-01-12
Strange people and strange things – if you don’t have the skills, don’t take on such tasks.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.