No-load single test of turbine

2017-05-15View Original

Thread Content

Can the turbine be tested individually without any load? What is the level of risk, and what are the precautions? Help! ! ! !
Reply #22017-05-15
It’s necessary to do this during construction; usually, the manufacturer’s debugging engineers are present, and they bear the associated risks. It’s sufficient for the owner to be present as a witness You need to pay attention to learning things like quick-close valves, the tuning of steam valves, the tuning of interlocks, and the procedures for starting up the system. The risk is that the speed control valve or interlocks are not properly adjusted. It’s due to overspeed or damaged bearing shells; generally, it’s necessary to carry out alignment work before starting up, as well as static testing of the turning gear and various interlocks. As long as an emergency stop function is available, there are usually no problems. Compared to load testing, the biggest issue with the turbine is an increased steam consumption, and the exhaust temperature is higher than when it is under load~~
Reply #32017-05-15
I took a look at your profile picture; it seems like you’re a maintenance engineer? In that case, there should be no major issues regarding meeting the data and requirements for the initial installation from a mechanical standpoint. Also, it’s important to check whether any changes were made to the speed control system; if so, it’s still recommended to have the manufacturer’s technicians come and make the adjustments
Reply #42017-05-16
Thank you very much. After the turbine is overhauled, I want to conduct a single-unit test; I’m worried about potential problems. Starting it in conjunction with other systems also raises concerns, as there’s a risk that issues with the turbine could affect the progress of system startup. The control system didn’t move; it was only the turbine that was under maintenance

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.