Installation issues of skid-mounted pressure equipment systems

2017-11-29View Original

Thread Content

Regarding the assembly of the pressure vessels and pressure pipelines in skid-mounted pressure equipment systems, I asked the staff at the boiler inspection agency, and they said that no special licensing is required for the skid-mounted installation of such pressure vessels and pipelines. Check relevant documents: Article 3 of the Notice on Issues Related to the Safety Supervision of Pressure Equipment, issued by the General Administration of Quality Supervision, Inspection and Quarantine under Document No. Quality Inspection Special Letter [2012] No. 32, states that the manufacturers of modular pressure equipment systems must possess a manufacturing license for pressure vessels corresponding to the appropriate category. The pressure vessels in the system should be designed and manufactured by entities holding a design and manufacturing license for pressure vessels of the appropriate category, while the piping design in the system can be carried out by entities with a design license for pressure piping of the corresponding level, or by the same entity that designs the pressure vessels in the system. 2. Opinions of the Special Equipment Bureau of the General Administration of Quality Supervision, Inspection and Quarantine on the Implementation of the \"Safety Technical Inspection Regulations for Fixed Pressure Vessels\" (TSG 21-2016) (Quality Supervision Special Letter [2016] No. 46). 2. Registration for the use of skid-mounted pressure equipment systems or mechanical equipment systems (hereinafter referred to as \"equipment systems\"). (1) Pressure vessels and pressure pipelines installed in the “equipment system” shall be designed and manufactured by units with the appropriate qualifications, and shall undergo manufacturing supervision inspections in accordance with the requirements of relevant safety technical specifications. (2) For an “equipment system” that includes pressure vessels or pressure pipelines, the manufacturer must hold a pressure vessel manufacturing license, a pressure pipeline component manufacturing license, or a pressure pipeline installation license corresponding to the relevant category; the system shall undergo manufacturing supervision inspections (for those pressure pipeline components for which manufacturing supervision inspections are not specified in the safety technical specifications, the requirements for installation supervision inspections may be applied as a reference). (3) The pressure pipelines in the “equipment system” can be treated as auxiliary devices of pressure vessels and registered for use in accordance with the regulations applicable to pressure vessels ; For those that are only pressure pipelines, registration for use shall be carried out in accordance with the regulations for pressure pipelines. (4) The “equipment system” shall be subject to direct application by the user unit for registration of use (except for simple pressure vessels and pressure vessels falling within the scope of 1.4 of these regulations), and there is no need to submit notifications for the installation of pressure vessels or pressure pipelines, nor to conduct installation inspections. According to the descriptions in the above documents, the design, manufacturing, and installation of pressure vessels and pressure pipelines in skid-mounted systems require relevant qualifications. Our company specializes in manufacturing complete compressor skid units. Among them, the pressure vessel is purchased externally, while the pressure pipeline is designed and installed by ourselves. Now, as required by regulations, it is necessary to obtain: qualifications for pressure pipeline design, qualifications for pressure pipeline installation, and qualifications for pressure vessel installation. Is that so?
Reply #22017-11-29
I think relevant qualifications are necessary, and it seems there are also corresponding standards and regulations.
Reply #32018-07-13
I understand: Your company only needs to obtain the qualifications for pressure pipeline design and pressure pipeline installation. (In fact, the design work for pressure pipelines can be done by another company, who will then add their seal to the documents); there is no need to have qualifications for pressure vessel installation. We can discuss any issues that arise.
Reply #42018-07-19
After going through the training, the company obtained Level 1 qualifications for pressure pipeline installation and vessel installation. However, according to the regulations, only a pipeline installation qualification is required to install such vessels.
Reply #52018-08-21
Pressure vessels and pressure pipelines installed in the \"equipment system\" shall be designed and manufactured by units with the appropriate qualifications, and shall undergo manufacturing supervision inspections in accordance with the relevant safety technical specifications. Which party carries out this supervision and inspection? Will a certificate be issued?
Reply #62019-07-15
We are also facing this problem. Which entity is responsible for conducting the supervision and inspection? The boiler inspection agency?
Reply #72020-10-19
Yes, it falls under the category of supervision and inspection during the manufacturing process, carried out by the local pressure vessel inspection agency

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.