Issues regarding the signing of design and construction drawings for pressure vessels

2018-07-24View Original

Thread Content

Today, someone suddenly said that when signing the design and construction drawings for pressure vessels, the reviewer should only sign the overall layout drawings and not the drawings of individual components. I have been working on pressure vessel design for nearly 10 years, and throughout this time, both the overall layout drawings and the detailed component drawings have required three levels of approval: design, verification, and review. When someone said that suddenly, I really wasn’t prepared for it. I looked for relevant standards and guidelines to back it up, but couldn’t find any. Please, Heyou, share your views and find some evidence for them. I am extremely grateful. :handshake:handshake
Reply #22018-07-24
According to the Solid and Liquid Waste Regulations, the design layout requires signatures at a minimum of 3 levels. It wasn’t said that part drawings are also needed. So it’s fine to sign only the general plan.
Reply #32018-07-24
Mm-hmm, thank you. I know this one. My understanding of this point is that it is merely a emphasis on the overall layout, and it is essential. It doesn’t mean that component diagrams and part drawings are not needed either.
Reply #42018-07-24
It depends on the regulations of each organization; the drawings of pressure-bearing components should still be reviewed and approved
Reply #52018-07-24
The system documents may vary from company to company; in our company, drawings at the overall layout and component level require three levels of approval, while part drawings require two levels of approval.
Reply #62018-07-24
That makes sense; this should be related to the regulations on design quality systems in various organizations.
Reply #72018-07-24
Right? Whether we are subject to Ronggui’s supervision or not, the overall design drawings require level 4 approval, while the part drawings and component drawings require level 3 approval. So when someone suddenly asked me, I really can’t explain the basis for it.
Reply #82018-07-24
Have you been busy lately? I haven’t seen you in a long time. Are you back to being a moderator?
Reply #92018-07-24
Thank you. I’m a bit busy; I don’t plan to do it for now. . . :handshake:handshake
Reply #102018-07-24
For ordinary components, only level 2 is signed
Reply #112018-07-24
In my opinion, if the design layout already includes the specifications and materials of all compressed components, then only a third-level approval for that design layout is required. If there are unspecified stressed components that need to be clarified in the part drawing, especially when it comes to important design information such as special manufacturing requirements, heat treatment, non-destructive testing proportions, and welding joint factors, then such a part drawing should have the same approval level as the assembly drawing.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.