HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Calibration issues of welding of integral rigid ring support with backing plate and steel pipe leg.

2019-01-09View Original

Thread Content

Dear gods: Hello, as shown in the picture, the inner diameter of the tank is 3200, the total height is 12000, and the working weight is 75000kg. It is designed as an integral rigid ring support with a backing plate and welding of 6 steel pipe legs as shown in the picture. How should the welding between the legs and the rigid ring be checked, and whether such structural stability can be achieved?
Reply #22019-01-10
For your equipment, just calculate the rigid ring according to the standard. The pillars must consider the axial stress of gravity and the bending stress caused by wind load and earthquake load. The main purpose is to check the axial compression stability of the pressure rod.
Reply #32019-01-11
There is bending stress at the root of the column, and finite element software can be used to

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.