HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is the welding method for the reboiler tube sheet and shell appropriate?

2019-01-10View Original

Thread Content

Is the welding method for the reboiler tube sheet and shell appropriate? Node II
Reply #22019-01-10
Node II is designed in accordance with Figure a) of Appendix I I.2 of GB/T151-2014 for a tube sheet that does not serve as a flange, and it must meet the requirement that the design pressure is ≤ 4 MPa.
Reply #32019-01-10
This is a structure that is permitted by the standards; what is the owner worried about?
Reply #42019-01-10
If the medium causes crevice corrosion in the material, do not use such a structure.
Reply #52019-01-10
If you are concerned about fluid accumulation, you can request a seal weld on the inner side of the tube section
Reply #62019-01-10
The tube sheet is joined to the end of the cylinder via a short joint; this joint can be fabricated as a stiff short joint and then welded to the cylinder

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.