HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to calculate and consider the load-bearing capacity of the underlying supports during equipment installation?

2019-08-02View Original

Thread Content

How to calculate and consider the load-bearing capacity of the underlying supports during equipment installation? 1. For equipment installed on floors above the second floor, those that are light enough can be placed directly on the floor, while those that are too heavy to be placed directly on the floor need to be placed on the frame beams 2. For equipment installed on the first-floor floor, which ones can be placed directly on the ground regardless of their weight, and which ones require digging a foundation pit?
Reply #22019-08-03
This requires a structural engineering specialist to answer; the equipment engineering specialists probably can’t provide an answer.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.