HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

For a high-pressure reactor with an operating pressure of 33 kilograms, how should a hydrostatic test be carried out after it is purchased and brought to the site?

2019-09-07View Original

Thread Content

For a high-pressure reactor with an operating pressure of 33 kilograms, how should a hydrostatic test be carried out after it is purchased and brought to the site? I suspect that the machine seals provided by the manufacturer for us are not the right ones; they’re not high-pressure seals
Reply #22019-09-07
The quality certificate provided by the manufacturer must include information on hydrostatic testing, along with data and pressure rise and fall curves.
Reply #32019-09-08
After installation, a hydrostatic test must be conducted before it can be put into operation. Run a test with water.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.