HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Water accumulation in the skirt after secondary grouting

2020-08-07View Original

Thread Content

This is a photo inside the skirt of the tower; there is water remaining even after grouting. Normally, the grouting surface should be higher than the bottom of the drainage holes. What harm can occur if water remains in the skirt base for a long time?
Reply #22021-12-18
We require that the secondary grouting layer be at the same level as the bottom of the water injection port; any additional amount of grout used must be confirmed via an official voucher

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.