Issues regarding basic templates in the design process of static equipment

2018-08-10View Original

Thread Content

During the design process of static equipment, which types of equipment require basic design templates, and which ones necessitate that the design institute prepare such templates?
Reply #22018-08-10
Are you in a design institute or a manufacturing plant? Generally, only those with skirt bases require foundation formwork; nowadays, manufacturers produce foundation formwork more often
Reply #32018-08-10
An additional civil engineering foundation needs to be constructed in advance, along with equipment that imposes high loads
Reply #42018-08-11
If the user requests that the tower equipment be removed.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.