What considerations should be taken when resuming production at a chemical plant after it has been shut down for four years?

2021-05-12View Original

Thread Content

Dear experts, the original chemical and fiber production facilities were shut down due to poor profitability, and now production is set to resume. From the perspective of equipment management (including special equipment), what aspects need to be taken into consideration? How can we do a good job in equipment management in terms of integration with the manufacturing process? Thank you!
Reply #22021-05-13
1. When special equipment is put back into use, it is necessary to go through the relevant procedures depending on the type of special equipment involved. Registration and certification procedures must be carried out, and inspections are required if necessary. Equipment related to the manufacturing process requires inspections such as checking the wall thickness in the presence of corrosive media, and purging and pressure testing are both necessary. All kinds of process control equipment, valves, and instruments need to undergo joint commissioning again. It’s similar to the procedure for driving for the first time.
Reply #32021-05-13
Follow the procedures for initial commissioning step by step; before conducting a pressure test, carefully measure the wall thickness of areas where thinning is suspected. If corrosion or severe thinning is present, it is recommended to consult the design team to re-evaluate whether a pressure test can be carried out, in order to avoid damaging the equipment.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.