HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Seeking help with issues in the calculation of ribbed spherical shell domes for storage tanks

2021-11-21View Original

Thread Content

Dear friends: When I followed the GB50341-2014 Design Code for Vertical Cylindrical Welded Steel Oil Tanks to carry out calculations for ribbed spherical dome roofs, I encountered a problem that I couldn’t figure out. In Chapter H.2.2 of this code, within the calculation process for ribbed spherical dome roofs, there are two values: e1 – the distance from the centroid of the combined cross-section formed by the longitudinal ribs and the roof panel to the mid-plane of the roof panel (in mm) ; e2----The distance from the centroid of the combined cross-section of the longitudinal ribs and the top plate in the transverse direction to the mid-plane of the top plate (mm). May I ask how these two values are calculated? ? Assume that the thickness of the roof slab of the ribbed spherical shell vault is 6 mm ; The thickness of the ribs is 10 mm ; The width of the ribs is 80mm ;
Reply #22021-11-22
It’s about the calculation of combined inertial moments; you can find out by looking at textbooks on mechanics of materials
Reply #32021-11-23
Just check the content related to mechanics of materials calculations
Reply #42023-09-19
The question here is: how is the cross-sectional length of the top slab determined in the composite section? Is it the intercostal distance? If the spacing between the ribs is this large, can it function as a composite cross-section across the entire length (width)?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.