HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Ten Years of Rapid Development in Chemical Equipment】Facilities for producing 742,000 tons of methyl tert-butyl ether from 1514 to 2023, as well as 700-ton peroxide reaction reactors

2024-03-23View Original

Thread Content

This post was last edited by “Fish Swimming in the Desert” on March 23, 2024, at 22:02. 2024: Spring has arrived, and the forum is filled with joy. ********************** [Ten Years of Great Development in Chemical Equipment] This is a continuously updated summary thread; all are welcome to join the discussion. https://bbs.hcbbs.com/thread-3576046-1-1.html (Source: Haichuan Chemical Engineering Forum) ***************** In December 2023, the first peroxidation reactor for the project aimed at the comprehensive utilization of C3 and C4 hydrocarbons, undertaken by Lanshi Heavy Equipment’s Mobile Factory Branch for Shandong Binhua New Materials Co., Ltd., was delivered. This reactor is part of a facility capable of producing 240,000 tons of propylene oxide annually and 742,000 tons of methyl tert-butyl ether annually. The delivery marks a significant milestone in the project’s progress, laying the foundation for the subsequent manufacturing of other equipment. This project serves as an \"engine-type\" project for the high-end chemical industry base in northern Shandong Province. It is also a key \"chain-leading\" project that Binzhou City is striving to attract in order to develop a large-scale integrated refining/gasification complex. It holds great significance for establishing a industrial chain in the park that covers both gas-related and chemical-related activities, as well as for fostering an ecosystem for the chemical new materials industry. Lanshi Heavy Equipment’s Mobile Factory Branch was responsible for manufacturing 3 reactors and 6 towers for this project. Among them, the peroxide reactor has a diameter of 9.2 meters, a length of over 24 meters, and a net weight of 700 tons; its wall thickness is 158 millimeters, making it a heavy-duty container with a large diameter and high weight. After more than 5 months of intensive construction, the first peroxide reactor was completed and delivered, while the remaining equipment has entered the later stages of manufacturing.
Reply #22024-03-24
:), Hah, that’s great haha
Reply #32024-03-24
:), Hah, that’s great haha

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.