Thread Content
(1) Check the appearance and packaging; (2) The parts, components, tools, accessories, spare items, instructions, and other technical documents are complete as listed in the packing list ; (3) Check all parts of the equipment, its components, and accessories for rust or damage ; (4) Verify whether the equipment foundation diagram and electrical wiring diagram match the positions of the available foot screw holes and power connection ports, as well as the relevant parameters ; (5) Spare parts, accessories, tools, etc. that do not need to be installed should be properly packed and stored, with care taken to transfer them together to prevent loss ; (6) Protect the handling and lifting equipment properly; any sliding surface that has not been cleaned must not be moved to prevent damage to the equipment ; (7) Keep detailed inspection records, and take photos or draw diagrams to document any damage or rust.
This post was last edited by fsgqzcn on 2018-1-22 at 16:38. The materials related to first-class construction engineers provide a detailed explanation, as follows: 1. When the equipment arrives at the site, it should first be inspected upon unboxing in accordance with the purchase contract and packing list. The main aspects of this inspection include: ① Checking the condition of the outer packaging to see if there are any damages to the packing boxes (including the inner plastic bags); ②Do the model, specifications, accessories, etc. of the delivered equipment match those specified in the contract? ; ③Packaged by component and part; does it match the packing list? ; ④Is there any damage or rust on the appearance of the equipment? ; ⑤Check whether the random technical documents are complete. 2. Precautions for on-site unpacking inspection: The items should be counted one by one in accordance with the packing list, and records should be kept. If any damage, rust, missing parts, or other issues are found, they should be documented through photography or other methods as evidence to use when filing claims with the supplier and relevant authorities. Attention should also be paid to the deadline for filing claims specified in the equipment purchase contract. It should also be noted that after the equipment has been inspected upon unboxing, if installation cannot begin immediately, it should be repackaged and protected from rust and moisture. 3. The unpacking inspection of the equipment delivered on-site is generally carried out according to the principle that the party who made the purchase is responsible for organizing it. The parties involved in this work are usually the owner, the contractor (the installation unit), and the supervision engineer; however, the supervision engineer typically only carries out on-site supervision and is not responsible for conducting inspections or signing off. 4. As an on-site supervision engineer, the main tasks include checking the following aspects: ① Verifying whether the specifications, models, and quantities match those listed in the schedule ; ② Check the equipment nameplate and overall appearance quality ; ③ Check the completeness, authenticity, and validity of documents such as the manufacturer’s certificate, inspection reports, test reports, and instruction manuals for the equipment.
It seems pretty good; I should come visit more often in the future
It’s mainly people – those who are involved need to know what they are doing, where things are stored, and to whom they should be delivered. This is especially true for large-scale equipment, which requires the involvement of mechanical, electrical, and instrumentation specialists. The parts in the box need to be checked one by one; if the receiving and sorting process is not done properly, there will be missing items during installation, or spare parts may get lost, or it might not be discovered until just before driving that the required components have not arrived