HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How long after the new hydrogen production facility starts operating does pipeline thickness testing begin?

2017-02-16View Original

Thread Content

How long after the new hydrogen production facility starts operating does pipeline thickness testing begin?
Reply #22017-02-16
The specific regulations are not clear; let me talk about the situation here. The facility was initially put into operation in 2008, and in 2010, technicians from the Special Inspection Institute conducted thickness measurements on the facility’s pipelines.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.