HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Bid Invitation for Urea Procurement Project in the Ningdong Area of Ningxia Electric Power in 2022

2022-01-21View Original

Thread Content

Bid Announcement for Urea Procurement Project in Ningdong Area of Ningxia Electric Power in 2022 Author/Source: Date: 2022-01-20 Clicks: 34 1. Bidding Conditions The name of this bidding project is: Public Bid for Urea Procurement Project in Ningdong Area of Ningxia Electric Power in 2022. The project’s bidding number is CEZB220400288. The bidder is **Energy Group Ningxia Electric Power Co., Ltd., while the project owners are Guoneng Ningdong Second Power Generation Co., Ltd., Guoneng Ningxia Yuanyanghu First Power Generation Co., Ltd., and Shenhua Guoneng Ningxia Yuanyanghu Power Generation Co., Ltd. The funding for this project comes from internal sources. *This project meets the requirements for bidding, and public bidding for domestic qualification review is now being conducted for it. 2. Project Overview and Scope of Bidding 2.1 Project Overview, Scope of Bidding, and Division into Bids (Packages): 2.1 Project Overview, Scope of Bidding, and Division into Bids (Packages): 2.1.1 Project Overview: Guoneng Ningdong No. 2 Power Generation Co., Ltd. uses the urea pyrolysis method to produce denitration reducers. The pyrolysis process involves lifting urea particles, dissolving urea, storing the solution, transporting it, measuring it, and then carrying out an adiabatic decomposition reaction. In accordance with the capacity requirements of the reductant storage and preparation systems for the denitration devices of the 2 boilers in Ningdong Phase II, a common reductant storage, unloading, and supply area is designated, and the design of this common area is carried out such that the denitration efficiency remains at least 85%. The ammonia production process via urea pyrolysis must ensure that the supply of reducing agent is sufficient to meet the requirements of different boiler loads and denitrification efficiency. The site of Guoneng Ningdong No. 2 Power Generation Co., Ltd. is located within the Yuanyanghu mining area of the Ningdong coal basin, approximately 90 km straight southeast of Yinchuan City and about 40 km straight southeast of Lingwu City. It is bordered by the Yuanyanghu mining area to the north, about 4.0 km away from the Yuanyang-Feng road to the west, and about 6.0 km away from Majiatan Town to the south. Transportation conditions: Within Lingwu City, there are expressways, national highways 211 and 307, as well as municipal roads X307 and 311, forming a road transportation network with four vertical and five horizontal routes, thus ensuring very convenient road transportation. Currently, there is the Dagu Railway, a dedicated line for the Lingwu mining area belonging to the local railway network. It starts from Daba Station on the Baotou-Lanzhou Railway in the west and extends to Guyaozi Station in the Lingwu mining area in the east, with a total length of 70.1 km. The sites of Guoneng Ningxia Yuanyanghu No.1 Power Generation Co., Ltd. and Shenhua Guoneng Ningxia Yuanyanghu Power Generation Co., Ltd. are located about 2 kilometers northeast of Ciyaobao Town in Lingwu City, under the jurisdiction of the Ningxia Hui Autonomous Region. They are approximately 4.0 kilometers north of National Highway 307, and adjacent to the Ciyaobao water supply station to the east. The factory is located about 34 kilometers west of Lingwu City and approximately 64.5 kilometers away from Yinchuan City; it sits in an eroded area among desert low hills. The natural elevation of the plant site is 1312.3–1330.5 m. Most of the site area is semi-desertified wasteland. The 2×1100MW unit project at the power plant is one of the power generation units that support the **planned Ningdong-Zhejiang ±800 kV UHV DC transmission project. Two 1100MW ultra-supercritical indirect air-cooled coal-fired units will be built as part of the expansion phase of the first phase of this project, and flue gas desulfurization, denitrification, and high-efficiency dust removal facilities will be installed in accordance with zero-emission standards. 2.1.2 Scope of the tender: The scope of the tender for Guoneng Ningdong No. 2 Power Generation Co., Ltd. includes the packaging, transportation, supply, and loading/unloading of urea. A total of 2,945 tons of urea is to be purchased, with the following requirements: total nitrogen (on a dry basis) content ≥ 46.0%, biuret content ≤ 1.0%, water (H2O) content ≤ 0.7%, iron (as Fe) content ≤ 0.0010%, alkalinity (as NH3) content ≤ 0.03%, **sulfate (as SO42-) content ≤ 0.020%, and water-insoluble substances content ≤ 0.040%. Scope of the tender for Guoneng Ningxia Yuanyanghu No.1 Power Generation Co., Ltd.: Packaging, transportation, supply, and loading/unloading of urea. The planned quantity to be purchased is 1,400 tons. The required specifications are as follows: total nitrogen (N), on a dry basis, % ≥ 46.0; biuret % ≤ 1.0; water (H2O) content % ≤ 0.7; iron (as Fe) % ≤ 0.0010; alkalinity (as NH3) % ≤ 0.03; sulfates (as SO42-) % ≤ 0.020; water-insoluble substances % ≤ 0.040; particle size with d0.85–2.80 mm ≥ 90%. Scope of the tender by Shenhua Guoneng Ningxia Yuanyanghu Power Generation Co., Ltd.: Packaging, transportation, supply, and loading/unloading of urea. The planned quantity to be purchased is 3,440 tons. Requirements include: total nitrogen (N), on a dry basis, % ≥ 46.0; biuret % ≤ 1.0; water (H2O) content % ≤ 0.7; iron (as Fe) % ≤ 0.0010; alkalinity (as NH3) % ≤ 0.03; sulfates (as SO42-) % ≤ 0.020; water-insoluble substances % ≤ 0.040; and particle size within the range of d0.85–2.80 mm to be ≥ 90%. Bids for this tender are to be submitted based on the price of urea at the time of delivery to the plant, while the final settlement amount will be determined according to the actual amount used. Deliver in batches as required by the notice (including transportation, loading/unloading, packaging, etc.). 2.1.3 Delivery location: the sites of Guoneng Ningdong No. 2 Power Generation Co., Ltd., Guoneng Ningxia Yuanyanghu No. 1 Power Generation Co., Ltd., and Shenhua Guoneng Ningxia Yuanyanghu Power Generation Co., Ltd. 2.1.4 Delivery period: The supply period is one year, with the start date of supply subject to the notice from the tendering party. If the supply period has not yet reached one year, the contract will automatically terminate once the planned quantity has been supplied. The planned supply period for Guoneng Ningdong No. 2 Power Generation Co., Ltd. is from March 1, 2022, to February 28, 2023. The planned supply period for Guoneng Ningxia Yuanyanghu No.1 Power Generation Co., Ltd. is from July 1, 2022, to June 30, 2023. The planned supply period for Shenhua Guoneng Ningxia Yuanyanghu Power Generation Co., Ltd. is from July 1, 2022, to June 30, 2023. 2.2 Others: / 3. Bidder Qualification Requirements 3.1 Qualification and Experience Requirements: [1] Qualification Requirements: (1) The bidder must be an independently registered legal entity or other organization, and must provide valid proof documents. (2) If the bidder is an agent, it must provide a valid authorization from the urea manufacturer for this project (please provide it in accordance with the format and content specified in the tender documents under the heading “Manufacturer’s Authorization Letter”). 【2】Financial requirements: / 【3】Performance requirements: From January 1, 2017, to the bid deadline (subject to the contract signing date), the bidder must have at least 2 completed urea sales contracts, with each contract covering a supply volume of 1,000 tons or more. Bidders must provide scanned copies of contracts that demonstrate compliance with the performance requirements for this tender; these scanned copies must include at least the pages bearing the seals of both the buyer and seller, the date the contract was signed, and the key information related to the performance requirements. 【4】Credit requirements: / 【5】Other requirements: / Note: Qualifications and performance records of parent and subsidiary companies cannot be used interchangeably. 3.2 Joint bids are not accepted for this project. / 3.3 Bids from agents are accepted for this project. (1) A manufacturer may assign only one agent to bid on the same tender package for devices/materials of the same brand and model ; (2) The manufacturer and agent of the same brand shall not simultaneously bid for the same tender package. 4. Acquisition of tender documents *The purchase of tender documents begins on 2022-01-19 at 16:00:00, and the deadline for purchasing them is 2022-01-25 at 16:30:00. 4.4 The price per set of the tender documents is 500.0 RMB per bid section (package); this amount is non-refundable after purchase. The deposit for Technical Documents, Lot 1: 0.0 yuan, to be refunded upon return of the technical documents (without interest).
Reply #22022-01-21
Bid Invitation for Urea Procurement Project in the Ningdong Area of Ningxia Electric Power in 2022

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.